Hello!
We would like to know at what time is the deadline to submit, and is the 15 minutes presentation due friday the 3rd as (See more) well?
Please sign up or sign in to like or comment on this post.
Ali Awada
Comment hidden. Show this comment
Ali Awada Good Morning, the deadline to submit is end of day May 3rd (11:59pm). Please note that the 15 mins presentation is not due on Friday. However, we strongly recommend that you submit the presentation if ready on Friday in case your teams were shortlisted to present on Wednesday May 8th, 2019.
good evening,
Is it possible to post what is exactly required for Friday? a portfoloio booklet , drawing format with animation, all on cd to (See more) be submitted at your offices and/or ?? uploading files?
Please sign up or sign in to like or comment on this post.
Lebanese University
Comment hidden. Show this comment
Lebanese University and ppt file?
Ali Awada
Comment hidden. Show this comment
Ali Awada Good Morning, As mentioned in the presentation the deliverables are: 1) A3 booklet in pdf form 2) Fully-rendered plans and 3Ds 3) 1-minute walkthrough 4) Feed (walkthrough plus a few good pictures) for web public voting purposes 5) 15 minutes presentation to the Jury (only shortlisted candidates will present it live)
Hello!
We would like to know if the fire exit should necessarily open towards the outside (as in towards the corridor).
Also, can the wall where there (See more) exists the niches in the corridor be destroyed?
Thank you in advance.
Please sign up or sign in to like or comment on this post.
Youmna Hachach
Comment hidden. Show this comment
Youmna Hachach Good Morning ALBA! The walls within the niches are not structural and can be removed. Also, all fire exits have to open towards the outside, at least, or can open both ways.
Hello ! Do you consider that the existing toilets are accessible for people with special needs, or do they have toilets elsewhere? Since we cannot (See more) remodel this area we need to know how to manage our different accesses.
Please sign up or sign in to like or comment on this post.
Youmna Hachach
Comment hidden. Show this comment
Youmna Hachach Hello ALBA! People with special needs have a dedicated bathroom in the Serial already that can be used.
Lebanese Academy of Fine Arts
Reply hidden. Show this reply
Hello, we have a question concerning the corridor.

We are lowering the interior space by 50cm; however, in order not to lose space inside, we were (See more) wondering whether or not we can use the corridor as a ramp.
Thank you for your cooperation in advance.

Best,
NDU
Please sign up or sign in to like or comment on this post.
Youmna Hachach
Comment hidden. Show this comment
Youmna Hachach Good Morning NDU! We cannot do that. The corridor is a common area that connects other functions in the Serail.
Hello, we have a question about the 4 independent offices.
In the space program, it’s written : capacity 2. Do you mean that each one (See more) of these offices is for 2 people or we can have minimum 2 offices and maximum 4 ? (for one)
Please sign up or sign in to like or comment on this post.
Youmna Hachach
Comment hidden. Show this comment
Youmna Hachach Good Morning ALBA! We will need 4 independent offices that can fit a capacity of 2 people. These offices are different than the co-working space and the meeting room.
Lebanese Academy of Fine Arts
Reply hidden. Show this reply
Lebanese Academy of Fine Arts Thank you for your reply!
Hello, after taking measurements on site, the height of the center of the arch turned out to be 5.05 meters. This value is different from (See more) the one given in the sections in the autocad file. Can you please specify the value we are supposed to work upon? Thank you !
Please sign up or sign in to like or comment on this post.
Salim Ansari
Comment hidden. Show this comment
Salim Ansari Hi we have assumed in the autocad drawings that we have 50 cm excavation depth. so this leaves you with 555 cm . height. and 10 cm finish the result will be 545 cm.
Lebanese Academy of Fine Arts
Reply hidden. Show this reply
Lebanese Academy of Fine Arts Hello ! Thank you for your reply. To conclude, we will be working on the 545 cm considering the 50 cm included not as mentioned in the given technical drawings.
Hello, all universities! Please find below the updated space program table. If you have any questions, please let us know.
Please sign up or sign in to like or comment on this post.
Lebanese University
Comment hidden. Show this comment
Lebanese University noted thank you
Hello, students are asking if the program has been modified and will be uploaded on the platform (for example 2 independent offices instead of 4) (See more) , how can they check out?
Please sign up or sign in to like or comment on this post.
Youmna Hachach
Comment hidden. Show this comment
Youmna Hachach Hello Lebanese University! The program has been modified and I will be sharing the details in a separate post.
Hello, Is the 3D of the space available? and Can students puncture the vaults to hang structures, lights...?
Thank You!
Please sign up or sign in to like or comment on this post.
Milad Abu Jaoudeh
Comment hidden. Show this comment
Milad Abu Jaoudeh yes you can fix lightings,cable trays, A/C ducts ..with adequate rod bolt .but not heavy structure like cat walks or similar.
Salim Ansari
Comment hidden. Show this comment
Salim Ansari Good morning ,you have to create your own 3D based on the plans and sections you have.

This Post Has 2 Comments

Comments are closed.

Close Menu
Yes No